Schedule and alterations for the Wraith 'C' Series chassis detail drawings.

Identifier  ExFiles\Box 108\2\  scan0159
Date  22th September 1938
  
To Ry & Rm.{William Robotham - Chief Engineer}......From RHC.{R. H. Coverley - Production Engineer} 600' RHC.{R. H. Coverley - Production Engineer}1/MC.22.9.38.

WRAITH "C" SERIES

In accordance with the completed Chassis Instruction Schedules, Drawing Office release of all detail drawings for the above series is to be concluded by November 12th 1938.

It is understood from Rm{William Robotham - Chief Engineer}/Gry.{Shadwell Grylls}5/MH.{M. Huckerby}16.9.38., however, that there is a possibility of further standardisation sheets being issued, and unless detailed information is shortly available regarding these, it will not be possible to complete same in time for incorporation on "C" series.

In order that tool and cost investigations may be carried out, will you please, therefore, arrange that all necessary detail drawings including lists of new and replaced parts relating to these alterations, are issued to us by October 5th, since we cannot guarantee that alterations issued after this date will be cleared for "C" series.

It should be noted that a similar period of time will also be required for investigation of alterations on all subsequent chassis series.

RHC.{R. H. Coverley - Production Engineer}
  
  