Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Requesting the completion of a steering system fitting on a chassis for a 10,000 miles test.

Identifier  ExFiles\Box 87\5\  scan0229
Date  29th December 1936
  
250.

To HPS.{Horace Percy Smith - Experimental Factory Mgr} from Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer}

Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer}12/AP.29.12.36.

6.B.1V. STEERING.

Will you please complete the fitting on a further one of the 7.500 pendulum levers to Ex.17856 to suit the above chassis. The bijur pipe should be fitted with a banjo connection at the upper end to suit 6.B.1V. It is intended that Rm{William Robotham - Chief Engineer}/GWH.{George W. Hancock - Head Chateauroux} should take this lever with him and fit it during the 10,000 miles test.

Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙