Rolls-Royce Archives
         « Prev  Box Series  Next »        

Instructions and parts list for the Ripplet Chassis, Frame & Fittings.


Identifier  ExFiles\Box 118\1\  scan0058
Date  30th January 1940
  
1022

TO. Rm {William Robotham - Chief Engineer}
File
EV {Ivan Evernden - coachwork} /HH. 5./ 30. 1. 40
Clan/EXP.

RIPPLET CHASSIS

Frame & Fittings. Section 7000

In accordance with FD. {Frank Dodd - Bodies} 471

Please receive herewith 3 blue prints of the following new drawings.

RF. 261 Top Plate Starting Handle Bearing 1 off
RF. 262 Bracket Starting Handle Bearing 1 off

The following parts will also be required.

FW. 1886 Starting Handle Bearing 1 off
FB. 4982/6 Adjusting Packing for Bearing 1 off to suit
KB. 751 Stud Starting Handle Brg: 2 off
K. {Mr Kilner} 4310 Nut Starting Handle Brg: 2 off
K. {Mr Kilner} 9008 Washer Starting Handle Brg: 2 off
F. {Mr Friese} 88243 Setscrew Centre Lamp Bracket 4 off

This completes the instructions for the above scheme.

For the first Ripplet Chassis, the parts RF. 261/2 should be bolted on to the front crossmember, but on subsequent frames will be supplied by the frame makers.

Please instruct up as required.

EV {Ivan Evernden - coachwork} /HH.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙