From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Status of material orders and drawings for the Phantom III and 25/30 HP chassis.
Identifier | ExFiles\Box 142\2\ scan0349 | |
Date | 26th February 1936 | |
X1200 Wor.{Arthur Wormald - General Works Manager} [strikethrough] c.c. Bey. c.c. E.B. c.c. Hs.{Lord Ernest Hives - Chair} BY/Cgh.{W Clough}8/G.26.2.36. CHASSIS MATERIAL ON ORDER. With reference to Wor.{Arthur Wormald - General Works Manager}10/T.25.2.36. detail drawings were issued as promised in BY/Cgh.{W Clough}17/G.18.2.36. but in regard to the items referred to therein which were not settled by Design Department, the position is as follows :- PHANTOM III. CHASSIS. Carburetter Air Silencer. } Schemes received from Design Carburetter Drain Pipes. } Department this a.m., and detail drawings will now be completed and issued on Thursday evening, 27th inst. Oil Pipes for Hydraulic Jacks. Further information just received from the Design Department, and detail drawings to cover same will be issued to O.P. Department on Friday, the 28th inst. Carburetters. Detail drawings have already been prepared, but the Works are not being instructed to go ahead until the model has been approved. 25/30 HP. CHASSIS. In regard to the carburetter air silencer and drain pipes, referred to under this heading in our BY/Cgh.{W Clough}9/G.13.2.36, for which we were waiting information from the Design Department, this information has since been received, and detail drawings were completed and issued to the O.P. Department on Wednesday last, the 19th inst. BY/Cgh.{W Clough} | ||