Standardisation of chassis parts, specifically a moulded Redmanol case for an ignition coil.


Identifier  ExFiles\Box 45\4\  Scan300
Date  31th May 1926
  
RR 755 (10H) (DB {Donald Bastow - Suspensions} 130 12-9-24) MS 301225
X4079
COMPLETED 14.6.26
STANDARDISATION of CHASSIS PARTS. Date 31.5.26
Description of Parts: Moulded Redmanol Case for Ignition Coil.
X No. 4079
Drawing No. 12
Part List X XI
Origin: Reduction in cost of manufacture and improvement in appearance of coil.

Experimental Test Report.
See EFC {E. Fowler Clarke - Electrical Engineer} 1/T4.10.24, EFC {E. Fowler Clarke - Electrical Engineer} 3/T 4.5.24, EFC {E. Fowler Clarke - Electrical Engineer} 2/T23.9.25, EFC {E. Fowler Clarke - Electrical Engineer} 2/T4.3.26. In addition to which a finer primary winding coil in Redmanol case has recently completed a 10,000 miles test on chassis 10-G-111 with entirely satisfactory results. In all this coil has done 14,000 miles. A further Redmanol encased coil(with std. winding) not explicitly mentioned in our previous reports has now completed

Road Test Report.
- 23,200 miles satisfactory. The moulding plant at the Works has ample capacity to produce these coil cars. It is proposed to make a simple production to ensure that the quality of Redmanol material...

Weight of Old Part.
Weight of New Part.
Difference per Car.
Cost of Old Part. £ 12. 11d.
Cost of New Part. £ 10. 0.d
Difference per Car £ 2. 11d. saving

Signature of Mr. De LOOZE that above is correct. Mv/Rb. {R. Bowen} 6.26

SIGNATURES, DATE, REMARKS
MR. C.W.B. JOHNSON, 4.6.26, Agreed. CWB.
MR. B. JOHNSON, 14 6 26, Agreed. FHR.
MR. ROYCE, , Agreed. FHR, on condition that the above as a complete coil is interchangeable with present standard.
MR. WORMALD, 1.6.26, Agreed. Wor. {Arthur Wormald - General Works Manager}
MR. ROWLEDGE, 9.6.26, Agreed. Rg. {Mr Rowledge}
MR. DAY, 3.6.26, Agreed. Da. {Bernard Day - Chassis Design}
MR. BAILEY, 2.6.26, This Change is dangerous - a change in quality or source of supply might easily land us in serious difficulty. I like the finish of the synthetic moulding but think risk run is too high to justify a change. BY. {R.W. Bailey - Chief Engineer}
MR. PLATFORD, 31.5.26, Agreed. EP. {G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT, 2.6.26, Agreed. E. {Mr Elliott - Chief Engineer}
MR. NORTHEY, 8.6.26, Agreed. PN. {Mr Northey}
MR. HIVES, 31.5.26, Agreed. E.Hives.

[Options Box]
A Scrap and replace at all costs, including Chassis already delivered to customers. [X marked]
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all chassis not yet handed to test.
D Use existing stock Alteration effective on future chassis.

Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.......
Series.........£.......
Series.........£.......

[STAMPED TEXT]: "20 H.P." CHASSIS ONLY
[STAMPED TEXT]: J.S. JUN 1926
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙