Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Millwright's Requisition for wiring up a 3-phase AC mains supply to an ignition testing bench.

Identifier  ExFiles\Box 167\2\  img107
Date  11th March 1938
  
MILLWRIGHT'S REQUISITION.
THIS REQUISITION TO BE USED ONLY FOR WORK WHICH DOES NOT COST MORE THAN THIRTY SHILLINGS.

DATE 11/3/38
O/N 6103 / 719./A 31942

WORK REQUIRED
Will you please have the 3 phase AC Mains wired up to the back of our Ignition Testing bench through a triple pole switch which is already in position. The mains are already installed close to this bench for Mr. Smedley's Eng'd.{John DeLooze - Company Secretary}

[Stamped across the text is the word 'COPY']

For Millwright's use only.
approved...
To be done by...

Signature: W. A.{Mr Adams} Robotham
(Full Name) Shop Superintendent

Dept. H.70
Any Materials required to be booked to standing O/N
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙