From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Flywheel vibration issues on the 'CHINA' project, worsened by attempts at stiffening.

Identifier  ExFiles\Box 137\4\  scan0369
Date  21th July 1931
  
HS.{Lord Ernest Hives - Chair} FROM R.{Sir Henry Royce}
X634
R2/M21.7.31.

C. to SG.{Arthur F. Sidgreaves - MD} WOR.{Arthur Wormald - General Works Manager}
C. to E.{Mr Elliott - Chief Engineer} BY.{R.W. Bailey - Chief Engineer}
'CHINA' - FLYWHEEL VIBRATION.
X. 634
X. 5300

In stiffening this with extra bearing and stiffer flange the result is much worse, and I think:

(1) We have now carried the period up to a speed where disturbing forces are great.

(2) That we carry the effect to the wheel by the stiffer flange.

(3) That the period is not out of the engine range, (not high enough,)

Therefore the extra bearing is not wrong, but the stiff flange is, and a trial should be made retaining the extra bearing and making the flywheel quite thin so that the crank deflection is not carried to the flywheel, and perhaps without the extra bearing it would be quite O.K. because the period would be so low that the inertia forces would be very small and not disturb the flywheel.

R.{Sir Henry Royce}
  
  