From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation report for the centralised lubrication of the rear axle brake mechanism.
Identifier | ExFiles\Box 141\2\ scan0013 | |
Date | 5th February 1931 | |
RR 755 (10H) (3-7-30) BM. 6/2571. X3806. COMPLETED 10.12.31. STANDARDISATION of CHASSIS PARTS. Date 5.2.31. Description of Parts. Centralised Lubrication to Rear Axle Brake Mechanism. Origin. To lubricate rear axle brake mechanism from one shot lubrication. Experimental Test Report. Fitted to 18.G.IV. Lubrication of axle is satisfactory with the above method. Road Test Report. Fitted to 18.G.IV. was satisfactory after modification had been made, ran 5,000 miles under all conditions. Right hand box: X No. 3806 No. 5420 Drawing NS.{Norman Scott} 3142 No. GL.{G. Linnett} 429. Part List A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. £ Cost of Old Part. £ Weight of New Part. £ Cost of New Part. £ (handwritten: Per sheet attached. No. 1.) Difference per Car. £ Difference per Car. £ Signature from Cost Dept. that above is correct. Cost of Parts in Works which will be scrapped if commenced on:- Series.........£....... Series.........£....... Series.........£....... Table: INITIAL | DATE | REMARKS SG.{Arthur F. Sidgreaves - MD} | 7-12-31. | Agreed Sg.{Arthur F. Sidgreaves - MD} R.{Sir Henry Royce} | 21.2.31. | Agreed FHR. WOR.{Arthur Wormald - General Works Manager} | 10.2.31. | Agreed Wor.{Arthur Wormald - General Works Manager} C. | 11.2.31. | Agreed C. RG.{Mr Rowledge} | 12.2.31. | Agreed Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} | 12.2.31. | Agreed Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} | 11.2.31. | Agreed By.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} | 12.2.31. | Agreed EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} | 12.2.31. | Agreed AE. PN.{Mr Northey} | 11.2.31. | Agreed PN.{Mr Northey} HS.{Lord Ernest Hives - Chair} | | Agreed Hs.{Lord Ernest Hives - Chair} STAMPS: 25 H.P. CHASSIS J.S. DEC 1931 | ||