Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Incorrect heelboard length and requesting a new sheet metal version based on correct schematics.

Identifier  WestWitteringFiles\T\2July1928-December1928\  Scan153
Date  20th October 1928
  
BY HS.{Lord Ernest Hives - Chair} } FROM DA{Bernard Day - Chassis Design}/EV.{Ivan Evernden - coachwork}
ORIGINAL
DA{Bernard Day - Chassis Design}/EV{Ivan Evernden - coachwork}3/M20.10.28.

re. HEELBOARD - 19-EX.
X615
X7390

Having now set out the wheel arches for this
car on N. scheme 2716. we find that the heelboard length
shewn on N. scheme 2714. and 2694. is wrong. We would
be glad if you would arrange for the sheet metal heelboard,
which should be sent to Hooper's, to be in conformity with
the wheel arch clearances on N. sch. 2716., and the wing
drawing N. scheme 2717.

DA{Bernard Day - Chassis Design}/EV.{Ivan Evernden - coachwork}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙