From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a thermometer with an electrical contact to prevent radiator shutters being left closed.

Identifier  ExFiles\Box 105\1\  scan0008
Date  4th January 1927
  
RR 755 REVISED (10H) (DE 444 6-10-26) BM.
X 5250 COMPLETED 15.1.27
STANDARDISATION of CHASSIS PARTS.
Date 4.1.27
Description of Parts. THERMOMETER WITH ELECTRICAL CONTACT.
Origin. To prevent shutters of radiator being left in closed position.
Experimental Test Report. This has been run 14,000 miles on the Phantom without trouble. Recently seen by Sales on 9-G-111.
Road Test Report. This item having been standardised on the Phantom, we consider that it is equally necessary on the 20 HP.
X No. 3875 (5250 handwritten above)
Drawing No. 5250
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part.
Cost of Old Part. £ 1. 15. 0
Weight of New Part.
Cost of New Part. £ 2. 18. 0
Difference per Car. £ 1. 3. 0 increase.
Signature from Cost Dept. that above is correct. My/Rb.{R. Bowen} 6.1.27
Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.......
Series.........£.......
Series.........£.......
INITIAL | DATE | REMARKS
BJ. | 14.1.27 | agreed
R.{Sir Henry Royce} | 7.1.27 | Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager} | 5.1.27 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 5.1.27 | Agreed. Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 6.1.27 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 5.1.27 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 4.1.27 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 6.1.27 | Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} | 13.1.27 | Agreed. PN.{Mr Northey}
CWB. | 10.1.27 | Agreed. CWB.
Hs.{Lord Ernest Hives - Chair} | 4.1.27 | Agreed. Hs.{Lord Ernest Hives - Chair}
STAMPS: R.R.L.D. 14 JAN 1927, 20 H.P. CHASSIS
  
  