From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a reduced axle ratio for chassis parts to increase performance.
Identifier | ExFiles\Box 172\1\ img126 | |
Date | 19th May 1928 | |
RR 755 REVISED (10H) (D.C. 777-29-2-28) MY C.LTD COMPLETED 7.6.28 STANDARDISATION of CHASSIS PARTS. Date 19.5.28 Drawing No. X No. 5350 Part List [X] D Use existing stock Alteration effective on future Chassis. Description of Parts: REDUCED AXLE RATIO. Origin: To increase performance. Experimental Test Report: The present axle ratio is 4.54 to 1 (11 X 50) The proposed ratio is 4.7 to 1 (10 X 47). It is not proposed to cancel the present ratio but the 4.7 will be an alternative. We are now using stiffer crankshaft on the 20 HP. which enables us to run the engine faster. Road Test Report: Run 15,500 miles on 10-G3 including 10,000 miles in France. Run 12,500 miles on 9-G3. Even when we adopt the small wheels we still think this will be a useful ratio. [Stamped diagonally in green ink: O.H.P. CHASSIS] Weight of Old Part. Weight of New Part. Difference per Car. Cost of Old Part: £ 3. 1. 0 Cost of New Part: £ 3. 1. 0 Difference per Car: £ None. Cost of Parts in Works which will be scrapped if commenced on: Series.........£......... Series.........£......... Series.........£......... Signature from Cost Dept. that above is correct. G/RD 6.6.28. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} APPROVAL TABLE: INITIAL | DATE | REMARKS BJ. | 7.6.28 | Agreed. BJ. R.{Sir Henry Royce} | 21/5/28 | Agreed - FMR WOR.{Arthur Wormald - General Works Manager} | 22.5.28 | Agreed. Wor.{Arthur Wormald - General Works Manager} RG.{Mr Rowledge} | 21.5.28 | Agreed. RG.{Mr Rowledge} DA.{Bernard Day - Chassis Design} | 22.5.28 | Agreed. Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} | 21.5.28 | Agreed. BY.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} | 21.5.28 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} | 21/5/28 | Agreed [E signature] PN.{Mr Northey} | 23.5.28 | Agreed. PN.{Mr Northey} CWB. | 21.5.28 | Agreed. CWB. Hs.{Lord Ernest Hives - Chair} | 19.5.28 | Agreed. Hs.{Lord Ernest Hives - Chair} | ||