Rolls-Royce Archives
         « Prev  Box Series  Next »        

Letter discussing the addition of stiffening ribs and a production timeline for frame components.


Identifier  ExFiles\Box 8\10\  10-page080
Date  10th April 1937
  
E {Mr Elliott - Chief Engineer} /Ev. {Ivan Evernden - coachwork} 1/MN.

10.4.37.

4) Details of any stiffening ribs which we may desire you to add to the vertical faces of the frame cross. These stiffening ribs will be added by tack-welding on this frame but on subsequent frames they would be pressed into the sheet.

It was agreed that provided you can go ahead and produce the thicker pressings for the side members this week end, and that we give you the information to enable you to punch the holes, etc. by Monday of next week, April 12, you would be in a position to supply us with a complete frame by the last day of April.

Yours faithfully,

For and on behalf of
ROLLS-ROYCE LTD.,

Design Dept.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙