Standardisation of an Autovac top in aluminium for chassis parts.

Identifier  ExFiles\Box 64\1\  scan0102
Date  28th June 1930
  
RR 755 REVISED (10H) (DG 348 19-7-29) BM. 6/643.
COMPLETED 9.9.30.
x7510
STANDARDISATION of CHASSIS PARTS.
Date 28.6.30
Description of Parts.
AUTOVAC TOP IN ALUMINIUM.
Origin: Saving in cost and weight.
Experimental Test Report. Road Test Report.
This alteration will be incorporated with the larger drop valve giving greater efficiency.
Running 10,000 miles on 24-EX.
Fitted to 19-EX.
[Faded Watermark: 20/25 H.P. CHASSIS PHANTOM]
X No. 5510 / 7510
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part.
Weight of New Part.
Difference per Car.
Cost of Old Part. £. For either
Cost of New Part. £. 12. 0d. 40/50 or
£. 8. 0d. 20/25 HP. chassis.
Difference per Car. £. 4. 0d. Decrease.
Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.........
Series.........£.........
Series.........£.........
Signature from Cost Dept. that above is correct. C/RG.{Mr Rowledge}1.9.30.C.9.9.30. W.P.
INITIAL | DATE | REMARKS
BJ. Sg.{Arthur F. Sidgreaves - MD} | 4.9.30 | Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 2.7.30 | Agreed MR.
WOR.{Arthur Wormald - General Works Manager} | 1.7.30 | Agreed Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 1.7.30 | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 2.7.30 | Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 30.6.30 | Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 30.6.30 | Agreed, if O.K. after 10,000 miles test. Could do with greater efficiency. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 5.7.30 | Agreed AE.
PN.{Mr Northey} | 2.7.30 | Agreed PN.{Mr Northey}
CWB. | | Agreed C.
Hs.{Lord Ernest Hives - Chair} | | Agreed Hs.{Lord Ernest Hives - Chair}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙