Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a baffle on the silencer to reduce heat in the body.

Identifier  ExFiles\Box 71\1\  scan0300
Date  25th May 1927
  
RR 752 REVISED (10H) (DE 649 9-12-26) BM. 2/1187.
4830
COMPLETED 20.7.27
STANDARDISATION of CHASSIS PARTS.
Date 25.5.27
Description of Parts. BAFFLE ON SILENCER TO REDUCE HEAT IN BODY.
Origin. To overcome complaints.
X No. 3908 823
Drawing No. 8830
Part List
Experimental Test Report.
An aluminium asbestos lined baffle is fitted above the silencer. It is well protected by the silencer from damage.
Road Test Report.
Fitted to 14-EX - run 1000 miles.
Fitted to 8-EX - run 500 miles.
Tests shew it to be a definite improvement. Recommended for standardisation at once.
A Scrap and replace at all costs, including Chassis already delivered to Customers
B Scrap and replace on Chassis in Works
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part.
Weight of New Part.
Difference per Car.
Cost of Old Part. £ 6/-
Cost of New Part. £ 18 - 6
Difference per Car. £ 12 - 6 increase
Signature from Cost Dept. that above is correct. MyRh 7/7/27
Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£......
Series.........£......
Series.........£......
INITIAL | DATE | REMARKS
BJ. | 20.7.27 | Agreed. B.Johnson. For chassis for closed cars only.
R.{Sir Henry Royce} | 27.5.27 | Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager} | 25.5.27 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 30.5.27 | Agreed. Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 28.5.27 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 26.5.27 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 26.5.27 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 30.5.27 | Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} | |
CWB. | 27.5.27. | Something on these lines most urgently required to deal with cases of complaint. Agreed. CWB.
Hs.{Lord Ernest Hives - Chair} | 25.5.27 | Agreed. Hs.{Lord Ernest Hives - Chair}
  
  