Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Improvements and tests for the S.U. petrol pump on the Phantom III model.

Identifier  ExFiles\Box 149\4\  scan0109
Date  18th November 1936
  
1263
To E.{Mr Elliott - Chief Engineer} from Rm.{William Robotham - Chief Engineer}
Hs.{Lord Ernest Hives - Chair}
Rm.{William Robotham - Chief Engineer}27/AP.18.11.36.
S.U. PETROL PUMP.
We have not got much margin on the P.III. with the pump fitted with the new diaphragms.
The two improvements we want to make as soon as we can complete tests are:-
1. Air bottles on existing pump.
2. Larger float chamber needle valve seat.
The extra pump scheme may take longer than either of the above.
Rm.{William Robotham - Chief Engineer}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙