Cost estimate for extra jigs, tools, and equipment needed to bring the 'T' series chassis into production.

Identifier  ExFiles\Box 171\2\  img165
Date  28th May 1932
  
40/SO. STANDARDIZATION of PARTS.
ADJUSTMENT OF CHOKE WIRING.
Works request.
Run 10,000 miles on EX-23.
DRAWING NO. X V380
Est. cost of extra jigs, tools and equipment (Sft{Mr Swift}/Ws.1.5.34) - £43.0.0.
Could be brought on to production at 1st chassis in 'T' series, (Sft{Mr Swift}/GH.1.5.34) without scrap.
  
  