Introduction of a new standardized chassis part, including test date and costs.
| Identifier | ExFiles\Box 171\1\ img103 | |
| Date | 1st October 1927 | |
| STANDARDISATION OF CHASSIS PARTS (1) The number of the first chassis on which the new part will be fitted. E.2. (2) Date when the chassis will be handed to test. 1.10.27. (3) Cost of scrapped material, if any. Nil. (4) Cost of jigs and tools. Nil. Faint text showing through from reverse: To be considered with new type 'Goshawk(Aero Engine)(Codename for 20HP Car / Aero Engine after Kestrel(Aero Engine))' The bearing surfaces are very different from the 'Kestrel(Aero Engine)'. Some of common keyways will be removed. fitted for test purposes only. Table/Routing slip at bottom: INITIAL DATE L.B. 1.11.27 R. {Sir Henry Royce} 1.11.27 HOW 5.11.27 OR 15.11.27 AO 16.11.27 YB 18.11.27 EB 18.11.27 E 4-2-28 BWD HH 11.2.28 | ||