Standardisation proposal to temporarily replace failing Goshawk ignition coils with 40/50 coils.

Identifier  ExFiles\Box 172\2\  img001
Date  10th November 1922
  
R.R. 755 (5 H) (S.J. 291. 12-10-21) G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 3087.

R.{Sir Henry Royce} GOSHAWK.
STANDARDISATION OF CHASSIS PARTS. (Note: 'OF CHASSIS' is struck through)

Description of Parts
40/50 Ignition Coil for Goshawk. Temporary measure pending perfection of Goshawk coil in bakelite case.

Origin. Partial failures of std. Goshawk ignition coils under extreme conditions of bonnet temperature with retarded spark due to imperfect dielectric qualities of the bakelite (Elo) coil cases. Failures have developed which demand an immediate remedy. The 40/50 coil is the only complete remedy available at the moment.

Experimental Test Report. Road Test Report. A special road report is considered unnecessary owing to the hundreds of thousands of miles which have been run satisfactorily with the 40/50 coils on 40/50 chassis.

See EFC1/T10.11.22 . attached.

THIS STANDARDISATION IS A VERY URGENT TEMPORARY MEASURE ONLY AND SHOULD BE SIGNED, IF AGREED TO, WITHOUT DELAY.

Signature of Exp. Dept. that above is correct. E.{Mr Elliott - Chief Engineer} Hives. R.F. Clark.

Weight of Old Part.
Cost of Old Part. £ --

Weight of New Part.
Cost of New Part. £ ----

Difference per Car. Nil.
Difference per Car. £ ---

Signature of Mr. De LOOSE that above is correct.

SIGNATURES:
Mr. JOHNSON - DATE: 13.11.22. - REMARKS: Agreed. BJ.
Mr. ROYCE - DATE: 14/11/22 - REMARKS: Agreed FHR
Mr. WORMALD - DATE: 10.11.22. - REMARKS: Agreed. Wor.{Arthur Wormald - General Works Manager}
Mr. ROWLEDGE
Mr. DAY
Mr. BAILEY - DATE: 10.11.22 - REMARKS: Agreed, By.{R.W. Bailey - Chief Engineer} consider this absolutely necessary.
Mr. PLATFORD - DATE: 10.11.22. - REMARKS: Agreed on behalf of EP{G. Eric Platford - Chief Quality Engineer}, J.A.Maddocks.
Mr. NORTHEY

Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£............
Series.........£............
Series.........£............

Storekeeper advised re above:
Storekeeper's Signature
  
  