Standardisation of chassis parts concerning the adoption of drilled HP shock absorber valves and lubrication of Phantom I springs.

Identifier  ExFiles\Box 68\2\  scan0256
Date  20th November 1929
  
RR 755 REVISED (10H) (DF 687 4-1-29) BM. 2/5943.
X8520. COMPLETED 20.3.30.
STANDARDISATION of CHASSIS PARTS.
Date 20.11.29
X No. 8410 (Handwritten above: X8520)

Description of Parts. Adoption of drilled H.P. shock absorber valves and Lubrication of Phantom I springs with grooves.

Origin. [Handwritten: S/Ph] To overcome complaints of harsh riding.

Experimental Test Report. We find that we can make a big improvement by this combination.

Road Test Report. It has been tried on a number of cars with good results.

[Stamp: Received 20 MAR 1930]

Memo attached.

A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Weight of Old Part. Cost of Old Part.
Weight of New Part. Cost of New Part.
Difference per Car. Difference per Car.
[Handwritten in cost section: See memo attached. Agreed W.H. 18.3.30]

Signature from Cost Dept. that above is correct. [Handwritten Signature: G/R] [Date: 17/3/30] G.{Mr Griffiths - Chief Accountant / Mr Gnapp}

Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.......
Series.........£.......
Series.........£.......

TABLE OF INITIALS, DATES, AND REMARKS:
INITIAL | DATE | REMARKS
BJX Sg.{Arthur F. Sidgreaves - MD} | 20-3-30 | Agreed Sg{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 23.11.29 | Strongly in favour of properly lubricated springs. THR.
WOR.{Arthur Wormald - General Works Manager} | 25.11.29 | Agreed Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 22.11.29 | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 22.11.29 | Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 21.11.29 | Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 20.11.29 | Agreed in case complaint or obviously bad. Consider P.II has similar tendency, as discussed Rm.{William Robotham - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 23.11.29 | Agreed AE.
PN.{Mr Northey} | 21.11.29 | Agreed PN.{Mr Northey}
CWB. | 21.11.29 | Agreed C.
HS.{Lord Ernest Hives - Chair} | 20.11.29 | Agreed.
  
  