Rolls-Royce Archives
         « Prev  Box Series  Next »        

Specifications for magneto operation, including minimum sparking speed and timing adjustments.


Identifier  WestWitteringFiles\N\2October1925-December1925\  Scan275
Date  8th November 1925 guessed
  
-3- Contd.

Note:- The minimum regular sparking speed can be taken to be that speed at which 100 consecutive sparks, without missing, are given by the magneto at some time within a period not greater than 5 minutes.

(8) The timing of the magneto break shall not be varied more than ±3° by altering the primary point gap ± .004" from normal respectively.

(9) The maximum possible silence of operation of the magnet-o is essential.

(10) The direction of rotation of the magneto shall be anti-clockwise, looking on the driving end.

EFC. {E. Fowler Clarke - Electrical Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙