Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
And sketch proposing a solution for gas and hot air leaks through the floorboards and gate mechanism.

Identifier  WestWitteringFiles\O\January1926-March1926\  Scan162
Date  24th March 1926
  
TO HS.{Lord Ernest Hives - Chair} FROM AJS.
Copy to BY.{R.W. Bailey - Chief Engineer}
" LHS.{Lord Herbert Scott}
" DA{Bernard Day - Chassis Design}/EV.{Ivan Evernden - coachwork}

ORIGINAL

AJS1/M24.3.26.

Handwritten: X5500 Y3908
Handwritten: X5310

GAS LEAKS THROUGH
INDIA FLOORBOARDS.

We understand that you have again taken up the matter of hot air leakage into the body through/gate mechanism and we have discussed the matter with DA{Bernard Day - Chassis Design}/EV.{Ivan Evernden - coachwork} from the point of view of what can be done in the coachwork, and suggest that as far as the gearbox mechanism is concerned we can add to the gate quadrant a palm as indicated in the sketch hereunder, which we think should in conjunction with the bottom rail of the body, eliminate the gas leakage trouble.

Handwritten: EV{Ivan Evernden - coachwork} is DEALING WITH THE MUD & DUST PROBLEM.

AJS.

Text from sketch:
MINIMUM SPACE
TO PASS CHANGE QUADRANT.
GATE
BODY RAIL.
This INDICATES TOP OF FRAME
1.900
.200
2.750
2.750

Illegible stamp, possibly 'RECEIVED', with signature 'AJS' over it.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙