Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Chassis failures during a bump test after switching from split springs to solid leaf springs.

Identifier  ExFiles\Box 80\2\  scan0173
Date  28th June 1920
  
X2628

To R.{Sir Henry Royce} from Hs.{Lord Ernest Hives - Chair}
c. to CJ.
c. to Bn.{W.O. Bentley / Mr Barrington}
c. to E.{Mr Elliott - Chief Engineer}
c. to Da.{Bernard Day - Chassis Design}
c. to By.{R.W. Bailey - Chief Engineer}

Hs{Lord Ernest Hives - Chair}5/LG28.6.20.

X.1331.
X.2628. RE BUMP TEST ON REAR PART OF CHASSIS. X.3440.

It is noticeable since we have changed over from
split springs to the solid leaf springs that we are getting
more failures on the chassis frame itself. Previous to
changing over to the solid leaf springs we ran the rear part
of the chassis 134 hours on the Bump test. During that time
the only failures we had were rear springs breaking. We
have since completed another 60 hours running with the solid
bottom leaf springs. During that time we had the following
failures on the chassis:-

We had to replace Bolts F.419 which clip the stay
for the swival pin to the Cross Member on six
separate occasions,

We have also broken 2 stays for swivel pins F.2406.

After 175 hours running the Torque Tube Sphere failed -
one of the arms on the steel sphere broke off close
up to the sphere itself.


Hs.{Lord Ernest Hives - Chair}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙