Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Requesting the construction of a Phantom III propeller shaft to investigate inconsistent balance issues after fitting transmission dampers.

Identifier  ExFiles\Box 94\4\  scan0148
Date  7th April 1937
  
337.

HPS.{Horace Percy Smith - Experimental Factory Mgr} from Rm{William Robotham - Chief Engineer}/Smth. Rm{William Robotham - Chief Engineer}/Smth3/R.7.4.37.

P.III PROPELLER SHAFT.

We have recently fitted transmission dampers to
one or two P.III's, and have been troubled by the propeller
shaft balance being inconsistent. As we have issued a Depot
Sheet for fitting the damper in the case of drive groan
complaints, we want to investigate the out-of-balance quickly.

Will you please have built up a P.III propeller
shaft, complete with a 25/30 damper, in which each of the
following items are in independent balance:-

(1) Shaft.
(2) Damper hub.
(3) Inertia rings.

We shall then see if the balance can be upset by
turning the rings into different positions.

Rm{William Robotham - Chief Engineer}/Smth.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙