Letter chasing delivery of the Thermostat, which has reached the standardisation stage.

Identifier  ExFiles\Box 78\1\  scan0067
Date  12th June 1920
  
R.R. 199 (250T) (SD676 19-7-17) M P110865

X.3563
COPY.

Na.{Mr Nadin} from BY.{R.W. Bailey - Chief Engineer}
c. Bth.
c. Ms.

(Handwritten) 9585

BY1/P12.6.20.

X.3563 CHASSIS - TOP WATER CONNECTIONS.
THERMOSTAT CONTROL.

Now that the fitting of the Thermostat has got
to the Standardisation stage we consider it is absolutely
essential, both for yourselves and ourselves, that we
should get deliveries as early as possible.

The last we heard from you was your cable of the
28th. April, which read as follows:-

"Thermostat will be ready at the latest by two weeks for inspection"

The following cable was sent to you yesterday:-

"Re delivery of Sylphon tube, we have heard
nothing since your cable April stop When
can we expect delivery"

Will you please let us have all the available
information you have on the above subject, by return. We
are particularly anxious about deliveries, as we are very
much afraid we shall have to rely solely upon you for same -
therefore no doubt you will agree this is a very important
point.

BY.{R.W. Bailey - Chief Engineer}

(Stamp) EFC JUN 15 19 RECEIVED.
  
  