Rolls-Royce Archives
         « Prev  Box Series  Next »        

Progress of the change speed lever mechanism for 20/25 and Bentley models.


Identifier  ExFiles\Box 86\4\  scan0112
Date  29th March 1935
  
4228
To By. {R.W. Bailey - Chief Engineer}

Hs {Lord Ernest Hives - Chair} /Rm. {William Robotham - Chief Engineer} 3/KW.29.3.35.

Change Speed Lever Mechanism.

We hope that we are not getting committed too far ahead on change speed mechanisms for the 20/25 and Bentley, because the isolated scheme has proved successful and will be running 10,000 miles on 5-B-IV. In fact, as soon as this car has been tried on the road with the latest alteration, we propose to issue a Standardisation Sheet.

With reference to water excluders, we are anxious to make the screen from the drain hole to the brake camshaft integral with the carrier plate. We are having a sample made up experimentally. In view of this we do not want to get too far ahead producing existing carrier plates.

Hs {Lord Ernest Hives - Chair} /Rm. {William Robotham - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙