From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Spot and tack welding of the 'Myth' frame front gusset, comparing it to the previous 'B.V.' riveted frame.

Identifier  ExFiles\Box 110\2\  scan0032
Date  20th February 1941
  
727 1080

To Rm.{William Robotham - Chief Engineer} from Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}
c. to Ev.{Ivan Evernden - coachwork}
c. to Rm{William Robotham - Chief Engineer}/HH.

Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}6/SW.20.2.41.

MYTH.

F R A M E.{Mr Elliott - Chief Engineer}

On PL.441 - Frame front gusset, we show the frame front gusset spot welded and also tack welded to the frame side channels.

This was done because it was found necessary to weld the gussets to the frame, from the front pan to the dash-board on B.V.

The B.V. frame however, was of riveted construction and the fidgeting took place between these members due to the usual inconsistency for which riveting is noted..

As the Myth frame is of spot welded construction, this trouble should not occur and we feel that the first frame should be ordered spot welded only, as we can easily tack weld the two members together if found necessary.

Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}
  
  