Report form for standardizing a chassis part, specifying the chassis, test date, and material cost.
Identifier | ExFiles\Box 172\1\ img154 | |
Date | 13th April 1929 | |
STANDARDISATION OF CHASSIS PARTS The number of the chassis on which the new part will be fitted. 51 in 'O'. Date when chassis will be handed to test. 13.4.29. Cost of scrapped material, if any. Nil. Approval Table: ROW Passed 29.4.29 DR Passed 30.4.29 AG Passed A.{Mr Adams} 1.5.29 BT{Capt. J. S. Burt - Engineer} PassedA 30.4.29 EP{G. Eric Platford - Chief Quality Engineer} Passed 29.4.29 E Passed 1.5.29 PH Passed. 11.5.29 BWD Passed.A 17.5.29 AH PassedA 28.5.29 | ||