Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The selection and supply of hydrometers for delivered chassis.

Identifier  ExFiles\Box 44\5\  Scan047
Date  16th January 1920
  
Ck.{Mr Clark} from EP.{G. Eric Platford - Chief Quality Engineer}
c. to Bn.{W.O. Bentley / Mr Barrington} [struck through]
c. to WD.{Mr Wood/Mr Whitehead} [struck through]

X.3741.

EP{G. Eric Platford - Chief Quality Engineer}/T19/F16.1.20.

X 3741. RE. HYDROMETERS.

With reference to Bn{W.O. Bentley / Mr Barrington}'s memo. to you Bn{W.O. Bentley / Mr Barrington}4/W16120
I should like to know what type of the above is recommended for this job. I am anxious that a good one should be supplied, and am certainly of the opinion that it would be better not to supply [handwritten insertion: at all than to supply one] one of the many cheap varieties which are advertised.

Will Wd.{Mr Wood/Mr Whitehead} please see that sufficient are ordered to cover chassis already delivered, and instruct for these to be supplied to me on arrival so that I can arrange to have them sent out for chassis delivered.

EP{G. Eric Platford - Chief Quality Engineer}/T.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙