Test results for five sample oil coolers (PH III) with improved soldering and longer tube bulges.

Identifier  ExFiles\Box 131\5\  scan0016
Date  10th November 1937 guessed
  
RESULTS OF TESTS ON FIVE SAMPLE OIL COOLERS. (PH III)
WITH IMPROVED SOLDERING AND LONGER TUBE BULGES.

TABLE DATA:
COLUMN HEADERS:
OIL COOLER TESTED
TEST No I:
- PRESSURE (MAX) DURING TEST LBS/□"
- NO. OF PRESS. RISES
TEST NO. 2:
- MAX. PRESS. REACHED WITHOUT FAILURE (PRESS. RAISED 50LBS/□ AT A TIME) LBS/□"
- TIME HELD AT THIS PRESS. (MINUTES)
- PRESS AT WHICH FAILURE OCCURRED (LBS/□")
- TIME HELD AT THIS PRESS BEFORE FAILURE (MINUTES)
- POSITION OF FAILURE (SEE DIAGRAM BELOW)
REMARKS ON TESTS AND FAILURES

ROW 1:
- COOLER TESTED: No. 1
- PRESSURE (MAX): 200
- NO. OF PRESS. RISES: 1000
- MAX. PRESS. REACHED: NOT TESTED
- TIME HELD: NOT TESTED
- PRESS AT FAILURE: NOT TESTED
- TIME BEFORE FAILURE: NOT TESTED
- POSITION OF FAILURE: NOT TESTED
- REMARKS: COOLER ONLY TESTED ON TEST No1. THEN FITTED ON TEST BED FOR CONTINUED RUNNING.

ROW 2:
- COOLER TESTED: No. 2
- PRESSURE (MAX): 200
- NO. OF PRESS. RISES: 1000
- MAX. PRESS. REACHED: 300
- TIME HELD: 3
- PRESS AT FAILURE: 350
- TIME BEFORE FAILURE: 1
- POSITION OF FAILURE: POINT A

ROW 3:
- COOLER TESTED: No. 3
- PRESSURE (MAX): 200
- NO. OF PRESS. RISES: 1000
- MAX. PRESS. REACHED: (a) 200, (b) 350
- TIME HELD: 3, 3
- PRESS AT FAILURE: 250, 400
- TIME BEFORE FAILURE: 1, 1
- POSITION OF FAILURE: POINT C, POINT A
- REMARKS: COOLER COMMENCED TO LEAK AT 250 LBS/□' AT MINUTE PORE IN BOTTOM PLATE (C). TEST CONTINUED UP TO 400LBS/□' FOR SOLDER FAILURE.

ROW 4:
- COOLER TESTED: No. 4
- PRESSURE (MAX): 200
- NO. OF PRESS. RISES: 1000
- MAX. PRESS. REACHED: 350
- TIME HELD: 3
- PRESS AT FAILURE: 400
- TIME BEFORE FAILURE: 1/2
- POSITION OF FAILURE: POINT A

ROW 5:
- COOLER TESTED: No. 5
- PRESSURE (MAX): 200
- NO. OF PRESS. RISES: 1000
- MAX. PRESS. REACHED: 350
- TIME HELD: 3
- PRESS AT FAILURE: 400
- TIME BEFORE FAILURE: 1
- POSITION OF FAILURE: POINT B
- REMARKS: TUBE COLLAPSED INSIDE COOLER AND ALLOWED PRESSURE TO TEAR SOLDER BOND.

DIAGRAM TEXT:
INVERTED PLAN
POINT 'C'
POINT 'B'
POINT 'A' (JUNCTION OF DIVISION PLATE AND BOTTOM PLATE)
  
  