From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation proposal for an improved spring drive on a chassis.
Identifier | ExFiles\Box 172\1\ img037 | |
Date | 22th June 1923 | |
R.R. 755 (S H) (S.J. 29). 15-10-21. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 3057. COMPLETED 10.7.23 STANDARDISATION of CHASSIS PARTS. Date 22.6.23 X No. 4222 Drawing No. Part List Description of Parts. IMPROVED SPRING DRIVE. Origin. Improved design. Experimental Test Report. The chief advantage in the improved design is that it does not require such accurate work. There can be no slack between the friction damping and the spring drive. Road Test Report. Fitted to 7-G-11 " " 3-G-11 Run 11,450 miles. Recommend we adopt this at once. A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Cost of Parts in Works which will be scrapped if commenced on :- Value of Stock at Series ZSC £. ? Series....... £....... Series....... £....... Signature of Exp. Dept. that above is correct. E.{Mr Elliott - Chief Engineer} Hives. Weight of Old Part. Cost of Old Part. £ 5. 18. 6 Weight of New Part. Cost of New Part. £ 6. 3. 0 Difference per Car. Difference per Car. £ 4. 6 increase. Storekeeper advised re above: Storekeeper's Signature Signature of Mr. De LOOSE that above is correct. My/JW 5.7.23 SIGNATURES | DATE | REMARKS Mr. JOHNSON / Mr. B. Johnson | 9.7.23 / 9.7.23 | Agreed. CJ. / Agreed. BJ. Mr. ROYCE | 25/6/26 | Closed FHR Mr. WORMALD | 22.6.23 | Agreed. Wor.{Arthur Wormald - General Works Manager} Mr. ROWLEDGE | 26.6.23 | Agreed. Rg.{Mr Rowledge} Mr. DAY | 25.6.23 | agreed Da{Bernard Day - Chassis Design} Mr. BAILEY | 23.6.23 | Agreed. BY.{R.W. Bailey - Chief Engineer} Mr. PLATFORD | 22.6.23 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer} Mr. NORTHEY | 25.6.23 | Agreed. PN.{Mr Northey} | ||