Millwright's requisition for a duplex coupling to be made for a speedometer and test rig.


Identifier  ExFiles\Box 167\2\  img094
Date  6th January 1938
  
TO EQUIPMENT DEPARTMENT.
MILLWRIGHT'S REQUISITION.
Date Issued: 6/1/38
Date Commenced: 6103
O {Mr Oldham} /N 6007/B 10517
52009
This Requisition is to be used for work estimated to cost over 30/- and under £50.
Work Required: Will you please have made for our Speedometer & test rig a duplex coupling between motor and speedo drive.
Equipment Dept. Approval
Estimate to be filled in before work leaves Equipment Dept.
COST.
ESTIMATED
Labour: 11.
Material: 3.2.6
Total: 14.12.6
ACTUAL
ESTIMATE APPROVED.
Supervisor or Works Manager: //
Millwright
Signature: W.A. Robotham
Dept: 470
(Full Name) (Foreman)
Approved: Halditch
(Full Name) (Supervisor if work is under £10)
(Works Manager if work is over £10)
Foreman Millwright
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙