Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Required repair work for a Phantom III Bumper Chassis.

Identifier  ExFiles\Box 119\1\  scan0034
Date  3rd June 1937
  
To HPS.{Horace Percy Smith - Experimental Factory Mgr}

1024

Rm{William Robotham - Chief Engineer}/Les.7/JH.3.6.37.

Phantom III Bumper Chassis.

The following work is required on the above chassis.

(1) We are continually breaking the triangular radiator stays, will you please fix up a single control stay.

(2) The bijur piping on the Wraith wheel movement levers has failed on the off side. This should be replaced by .125" diameter piping.

(3) The off side front engine rubber needs to be replaced.

Rm{William Robotham - Chief Engineer}/Les.{Ivan A. Leslie}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙