Labour cost and time breakdown for a bottom decarbonisation job.


Identifier  ExFiles\Box 107\2\  scan0054
Date  13th June 1941 guessed
  
Bottom decarb.
B182 EF

Fitters skilled. Rate semi. Rate £ s d
Removing cylinder block etc 1" 7 10 7d 1 . 1 . 8
Drop sump & examine bearing 10 hrs 1" 7
decarb top 18" 1" 3 18 8 1/2 1 . 15 . 3
adjust tappets & 1" 1" 0 1 8 1 . 8
after test
Test 4" 1" 8 3/4 - 1"4 11 . 0
decarb carburettor etc 3" 1" 3 3 . 9
clean down engine rough 2" 1" 2 2 . 4
£3 . 15 . 8

Oil con mileage 3 hrs @ 1/4

Total hrs 36 34 1/4

Total Labour hrs 70 1/4

70 1/4
49 1/4
119 1/2
  
  