From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a piston with 5 narrow rings to replace the existing 3 narrow and 1 wide ring design.

Identifier  ExFiles\Box 105\2\  scan0163
Date  6th April 1927
  
RR 782 REVISED (10H) (DE 649 9-12-26) BM. 2/1187.
Handwritten Top: x5040, Complete/ck{Mr Clark} 25.8.27, 57

STANDARDISATION of CHASSIS PARTS.

Date 6.4.27

Description of Parts. PISTON WITH 5 NARROW RINGS - INSTEAD OF 3 NARROW AND ONE WIDE AS AT PRESENT.

Origin. To improve design.

Experimental Test Report.
The present standard piston on 20 HP. has 3 rings .100" wide and one .187" wide. The proposal is to fit 5 rings .100" wide - this can be done without altering pin position of the top ring.
See drg. E.53955.

Road Test Report.
Fitted to 9-G-111 - run 8800 miles.
Fitted to 11-G-111 - run 3700 miles.
These are an improvement as regards gas tightness and reduce the tendency for rings to squeak.

[Right Side Box]
X No. 5040
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C [Ticked] Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

[Cost Section]
Weight of Old Part.
Cost of Old Part. £ 2. 4. 6d.
Weight of New Part.
Cost of New Part. £ 2. 10. 1d.
Difference per Car.
Difference per Car. £ 5. 7d. increase.
Signature from Cost Dept. that above is correct. My/Rb.{R. Bowen} 12.4.27.

[Cost of Parts Box]
Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.......
Series.........£.......
Series.........£.......

[Approval Table]
INITIAL | DATE | REMARKS
BJ. | 25.5.27 | agreed
R.{Sir Henry Royce} | 11.4.27 | Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager} | 6.4.27 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 13.4.27 | Agreed. RG.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 8.4.27 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 7.4.27 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 7.4.27 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 11.4.27 | Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} | |
CWB. | 5.5.27 | Agreed. CWB.
Hs.{Lord Ernest Hives - Chair} | 6.4.27 | Agreed. Hs.{Lord Ernest Hives - Chair}
Handwritten signature across RG{Mr Rowledge}, DA{Bernard Day - Chassis Design}, BY, EP{G. Eric Platford - Chief Quality Engineer}, E rows: Instructed

[Large green stamp overlaid on document: 20 H.P. CHASSIS]
  
  