Rolls-Royce Archives
         « Prev  Box Series  Next »        

List of required cables for the revised position of the junction box on a Phantom III.


Identifier  ExFiles\Box 168\1\  img279
Date  1st January 1937
  
To HPS. {Horace Percy Smith - Experimental Factory Mgr}
c. Rm {William Robotham - Chief Engineer} /Wst.

rl617.

BY {R.W. Bailey - Chief Engineer} /RD.3/B.1.1.37.

"PHANTOM III" WIRING AND FITTINGS : R.R.Sch.1015.
Revised Position of Junction Box.

In connection with the revised position of the junction box which has been issued to you, BY {R.W. Bailey - Chief Engineer} /RD.1/B.18.12.36., the following cables will be required :-

D.75869 - Junction Box to Side Lamp. 2 off.
D.75870 - Distribution Board No.4. to Junction Box. 1 off.
D.75871 - Distribution Board No.5. to Junction Box. 2 off.
D.75863 - Foot Switch to Junction Box. 1 off.
D.75864 - Horn Relay to Junction Box. 1 off.
D.75865 - Horn Relay to Junction Box. 1 off.
D.75866 - Junction Box to Horn. 2 off.
D.75867 - Junction Box to Headlamp Dipper. 2 off.
D.75868 - Junction Box to Headlamp Filament. 2 off.

Please put in hand as required.

BY {R.W. Bailey - Chief Engineer} /RD.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙