Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The delay in receiving a modified exhaust system for a 20/25HP Chassis 21-G-IV.

Identifier  ExFiles\Box 101\4\  scan0139
Date  2nd December 1935
  
To Rm.{William Robotham - Chief Engineer} from RHC{R. H. Coverley - Production Engineer}/WSC{W. S. Cassel}

x500a
Rm{William Robotham - Chief Engineer} [crossed out]

RHC{R. H. Coverley - Production Engineer}/WSC.{W. S. Cassel}8/EP.{G. Eric Platford - Chief Quality Engineer}2.12.35.
Wyman

20/25HP Chassis 21-G-IV

The above car has been in the shop for some considerable time and we are still waiting in accordance with Hs{Lord Ernest Hives - Chair}/Rm.{William Robotham - Chief Engineer}27/KW.5.11.35 for the modified exhaust system as called for on the above mentioned memo i.e. Modification to suit large bore engine, which was promised to be instructed by Hs{Lord Ernest Hives - Chair}/Wym.{G. Harold Whyman - Experimental Manager}

RHC{R. H. Coverley - Production Engineer}/WSC.{W. S. Cassel}

[Signature]

Instructed
4-12-35.

[Signature]
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙