The delay in receiving drawings for the proposed leather stocking for front shock absorbers.
| Identifier | ExFiles\Box 78\2\ scan0135 | |
| Date | 1st October 1919 | |
| R.R. 235 B (200 T) (S.F. 674, 22-5-19) G. {Mr Griffiths - Chief Accountant / Mr Gnapp} 2376 Da. {Bernard Day - Chassis Design} from BY. {R.W. Bailey - Chief Engineer} c. Mr Booth. ECB BY12/P1.10.19. CHASSIS - FRONT SHOCK ABSORBERS. X.3461.A ------- So far we have not received any drawings of the proposed leather stocking for the above. We have raised this question two or three times, but so far without success. EP. {G. Eric Platford - Chief Quality Engineer} must be delivering chassis which have no leather stocking fitted - this is quite wrong and I consider the design of the stocking should have prompt attention. In any case, it will be a month from the date we receive the drawings before we shall be able to get stockings on to chassis. BY. {R.W. Bailey - Chief Engineer} OXFORD BOND | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).