Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Fouling fault on the Phantom III front brake pull rod.

Identifier  ExFiles\Box 92\4\  scan0337
Date  1st June 1936
  
AFM{Anthony F. Martindale}
To Rm.{William Robotham - Chief Engineer} from Rm{William Robotham - Chief Engineer}/GWH.{George W. Hancock - Head Chateauroux}
c.c. RHC.{R. H. Coverley - Production Engineer}
306
Cricklewood
June 1st.
PH.III. FRONT BRAKE PULL ROD.
My attention was drawn to the fouling of the front brake rod on the side of the slot in the frame which it passes through. On the one I saw there was quite a flat worn on the side of the pull rod. The fouling occurs at the back edge of the slot. There have been several cases of this fault.
Rm{William Robotham - Chief Engineer}/GWH.{George W. Hancock - Head Chateauroux}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙