Rolls-Royce Archives
         « Prev  Box Series  Next »        

Supply requirements and a future delivery gap of India Tyres for the Bentley M. Chassis.


Identifier  ExFiles\Box 158\1\  scan0206
Date  30th August 1938
  
SECRET
1339
W/S. {Derby Works / Sales}
To Sg. {Arthur F. Sidgreaves - MD}
c. to Hs. {Lord Ernest Hives - Chair}
c. to Rm. {William Robotham - Chief Engineer}
ROY. {Mr H. Royce - Buyer} 3/B.30.8.38.
INDIAProduction 20 HP. with 4-speed box and Front Wheel Brakes TYRES FOR BENTLEY M.CHASSIS - Sg. {Arthur F. Sidgreaves - MD} 4/E.26.8.38
We draw our requirements periodically from a stock carried by the IndiaProduction 20 HP. with 4-speed box and Front Wheel Brakes Co. at Nottingham and in recent weeks have averaged 25/30 per week. To complete up to the 60th chassis in 'M' Series, we shall require a further 95 tyres.
I am advising the IndiaProduction 20 HP. with 4-speed box and Front Wheel Brakes Co. there will be a gap after delivery of such tyres, of some three months or so.
ROY. {Mr H. Royce - Buyer} [signature]
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙