Rolls-Royce Archives
         « Prev  Box Series  Next »        

Cracks found on the Front Engine Suspension Brackets for the Bentley III Bumper Chassis.


Identifier  ExFiles\Box 119\1\  scan0148
Date  26th October 1938
  
Handwritten notes:
A.F.M. If Waller has these parts fitted, ask him to examine them
Rm {William Robotham - Chief Engineer} Htb
1024.

Typed content:
To BY. {R.W. Bailey - Chief Engineer} from HPS {Horace Percy Smith - Experimental Factory Mgr} /LK. {L. King}
c. Dr.
c. Rm. {William Robotham - Chief Engineer}
c. Rm {William Robotham - Chief Engineer} /AFM. {Anthony F. Martindale}

HPS {Horace Percy Smith - Experimental Factory Mgr} /LK. {L. King} 1/VS. {J. Vickers} 26.10.38.

BENTLEY III BUMPER CHASSIS.

For reference, we attach hereto photograph indicating the position of cracks which have developed in the Front Engine Suspension Brackets FB.3632/3 produced in S/M. material.

These brackets have completed at least 100 hours test on the above chassis.

HPS {Horace Percy Smith - Experimental Factory Mgr} /L. King.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙