Cracks found on the Front Engine Suspension Brackets for the Bentley III Bumper Chassis.
| Identifier | ExFiles\Box 119\1\ scan0148 | |
| Date | 26th October 1938 | |
| Handwritten notes: A.F.M. If Waller has these parts fitted, ask him to examine them Rm {William Robotham - Chief Engineer} Htb 1024. Typed content: To BY. {R.W. Bailey - Chief Engineer} from HPS {Horace Percy Smith - Experimental Factory Mgr} /LK. {L. King} c. Dr. c. Rm. {William Robotham - Chief Engineer} c. Rm {William Robotham - Chief Engineer} /AFM. {Anthony F. Martindale} HPS {Horace Percy Smith - Experimental Factory Mgr} /LK. {L. King} 1/VS. {J. Vickers} 26.10.38. BENTLEY III BUMPER CHASSIS. For reference, we attach hereto photograph indicating the position of cracks which have developed in the Front Engine Suspension Brackets FB.3632/3 produced in S/M. material. These brackets have completed at least 100 hours test on the above chassis. HPS {Horace Percy Smith - Experimental Factory Mgr} /L. King. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
