Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Graph of speed curves for a combined pump and injector, showing injection period and pump lag.

Identifier  ExFiles\Box 179b\3\  img118
Date  1st February 1933 guessed
  
RR COMBINED PUMP & INJECTOR.
INJECTION PERIOD & PUMP LAG - SPEED CURVES.
ALL SUCTION CHAMBER HOLES PLUGGED EXCEPT ONE AT 120°.
FROM SUPPLY PIPE - HOLE 3 FIG. 1.
STANDARD CONDITIONS.
PUMP ANGLE. (°).
MAXIMUM INJECTION PERIOD.
NORMAL INJECTION PERIOD - INJ^N = (235cc's/CYCLE).
PUMP LAG.
MAX INJ^N.
NORMAL INJ^N.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙