Rolls-Royce Archives
         « Prev  Box Series  Next »        

Standardisation of materials and anti-rust treatment for the 25/30 HP and Phantom III exhaust systems.


Identifier  ExFiles\Box 104\2\  scan0251
Date  26th October 1936
  
γ 523

To E & By. {R.W. Bailey - Chief Engineer}

Rm {William Robotham - Chief Engineer} /Wym. {G. Harold Whyman - Experimental Manager} 21/JH. 26:10:36.

25/30 H.P. Exhaust System.

We are issuing a standardisation sheet for the adoption of "Aluminised" mild steel for the downtake pipe, front suspension box and intermediate pipe on the above cars and we would like you to incorporate the flange EB.2998 and other modifications for fastening the downtake pipe to the expansion box, actually a scheme similar to the one instructed for the Bentley.

We are also contemplating having the rear silencer shells on both 25/30 HP. and Phantom III exhaust systems treated before assembly by the Webb Anti-rust process in an attempt to cure the condensation trouble which eventually eats through the shell. Could By. {R.W. Bailey - Chief Engineer} find out whether, if this process is adopted, it would be cheaper to install our own chemical baths instead of sending all the shells to Webb's Ltd., at Enfield, Middlesex for treatment.

Rm {William Robotham - Chief Engineer} /G. Hyman.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙