From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Specification sheet comparing 'As Built' components with those 'To be Fitted' when available.
Identifier | ExFiles\Box 118\1\ scan0156 | |
Date | 15th March 1940 | |
- 5 - HPS{Horace Percy Smith - Experimental Factory Mgr}/CP.1/SW.15.3.40. As Built (Incomplete-) To be Fitted when available. REMARKS. Petrol Tank (cont) Parts similar to PD.382 "Cresta" type Filler to be despatched to coachbuilders when available. Petrol Tank (cont) Thin gauge tank - 16 gallon Petrol Filler concealed in wing. Electrically operated reserve tap. Pedals LOP.FB.4714. Standard Bentley V.{VIENNA} Production. Pedals. G.C.D. 1500 Dashboard LOP.RF.344. Complete to LOP incorp:- PL.3 Dashboard Contour RF.331 Dashboard. PL.99. Dashboard Mounted on Harris Bushes. Dashboard. Details required for Mounting Coils. Floorboards. LOP.FB.4144 Standard Bentley V.{VIENNA} Production. Floorboards. (continued) | ||