From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts, changing from cast iron to bronze valve guides to reduce wear.
Identifier | ExFiles\Box 171\3\ img240 | |
Date | 21th August 1924 | |
RR 755 (10M) (SL391 2-11-23) MP 281297 COMPLETED 5.9.24. STANDARDISATION of CHASSIS PARTS. Date 21.8.24 X No. 2764 Drawing No. Part List Description of Parts. BRONZE VALVE GUIDES IN PLACE OF CAST IRON. Origin. To reduce wear. Experimental Test Report. The guides are made of phosphor bronze in place of cast iron. The valves were ground taper at the top of the stem. See report attached ref. RHC{R. H. Coverley - Production Engineer}3/LS20. 8. 24. Road Test Report. Run 12,600 miles on 98-NK. Run 6,800 miles on 9-PK. Run 65 hours on test bench. No troubles. Considerably less wear than cast iron. Choices: A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Weight of New Part. Difference per Car. Cost of Old Part. £1. 8. 4 Cost of New Part. £1. 11. 9 Difference per Car. £ 3. 5 increase. Cost of Parts in Works which will be scrapped if commenced on:- Series...£...... Series...£...... Series...£...... Signature of Mr. De LOOZE that above is correct. My/Rhs. 27.8.24. SIGNATURES | DATE | REMARKS MR. JOHNSON | 4.9.24 | Agreed. C. Johnson. | Do not wait for BJ's signature. MR. B. JOHNSON | 15.9.24 | Agreed. B.J. MR. ROYCE | 29/8/24 | Agreed FHR MR. WORMALD | 22.8.24 | Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE | 21.8.24 | Agreed. Rg.{Mr Rowledge} MR. DAY | 22.8.24 | Agreed. Da.{Bernard Day - Chassis Design} MR. BAILEY | 22.8.24 | Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD | 22.8.24 | Agreed, Springfield report successful. MR. ELLIOTT | 28/8/24 | Agreed AE MR. NORTHEY | 22.8.24 | Agreed. PN.{Mr Northey} MR. HIVES | 1.9.24 | Agreed. E.{Mr Elliott - Chief Engineer} Hives | ||