Correcting the heat treatment procedure for 20/25 HP and Bentley chassis shims.
| Identifier | ExFiles\Box 115\1\ scan0109 | |
| Date | 3rd November 1936 | |
| Index BY {R.W. Bailey - Chief Engineer} /CS. [Struck through] G.ROY. {Mr H. Royce - Buyer} [Struck through] c.Rm. {William Robotham - Chief Engineer} [Struck through] C.WB {Mr Brazier / Mr Bell} /TB. [Struck through] X1070 BY {R.W. Bailey - Chief Engineer} /EM.1/J.3.11.36. 20/25 HP. CHASSIS SHIMS FOR CONNECTING ROD BEARINGS ONLY. BENTLEY CHASSIS SHIMS FOR CONNECTING ROD BIG END AND MAIN BEARINGS ONLY. --------------------------------------------- Further to our memo BY.1/G.30.10.36, the question of heat treatment of these parts has been raised by the Experimental Dept. who advise us that all their experimental running has been carried out with full heat treated material. Under these circumstances therefore, we should like to correct our memo referred to above in regard to using annealed parts and in place of same, we must follow the Experimental Dept's practice and have the parts fully heat treated. The heat treatment to be given is that which is usually specified for R.R.56 material namely, heat to 520°C. and quench in water followed by ageing for 16 hours at 160 to 170°C. and the hardness after this treatment should lie within the brinell range of 120 to 160. Will BY {R.W. Bailey - Chief Engineer} /CS. kindly amend our drawings in accordance with the above. BY {R.W. Bailey - Chief Engineer} /EM. [Signature] | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
