Rolls-Royce Archives
         « Prev  Box Series  Next »        

Production inspection, adjustment, and test specification for the cutout and regulator unit on Phantom III and Bentley models.


Identifier  ExFiles\Box 166\2\  img067
Date  5th March 1937 guessed
  
SPECIFICATION OF PRODUCTION INSPECTION, ADJUSTMENT, AND
TEST OF CUTOUT AND REGULATOR UNIT.

Type. Phantom III and Bentley. Comprising R.R. cutout and C.A.V. Bosch B.2.C.J.I. regulator mounted on one base.

CUTOUT.

(1) The cutout should first be examined with respect to the following points :-

(a) The cutout lever for freedom of motion; there should be no tendency to 'stick'.
(b) The contact surfaces for correct alignment.
(c) The contact bow spring tip should only just touch the armature tip without appreciable pressure.
(d) The contact surfaces for a definite rubbing action, between the points, after make and before break.
(e) The air gap for correct length. With the points just in contact, the gap between the armature stop, and the magnet pole face, should not be less than .012". If it is, the fixed contact point should be raised the required amount.

(2) The regulator connection to terminal A should be removed before testing the insulation of the cutout.
It shall now be ascertained that the fixed contact support is insulated from the frame of the cutout by applying an alternating voltage of 200 through a low c.p. lamp between it and the armature.

(3) The cutout shall then be connected up by low pressure cables to a large type dynamo, a 12 volt battery of suitable capacity, two ammeters A and B, and two voltmeters V and , according to diagram herewith,
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble