Standardisation of chassis parts, specifically Frame Tie Rods.

Identifier  ExFiles\Box 75\3\  scan0384
Date  26th June 1924
  
RR 755 (10H) (SL391 2-11-23) MP 281297
Handwritten top left: V/9260
Handwritten top right: Completed 7/7/24
STANDARDISATION of CHASSIS PARTS.
Date 26.6.24.
Description of Parts. FRAME TIE RODS‡
Origin. To increase stiffness of Frame.

[Right box]
X No. 4260
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis

[Main Section]
Experimental Test Report.
The frame ties are similar to those fitted to the 40/50 HP.
They reduce wear and tear and rattles on the coach-work.

Road Test Report.
Fitted to 5-G-11 - run 5000 miles approx.
Fitted to 68-GF.
No troubles.

[Blue stamp over test reports: CHASSIS]

[Bottom Section]
Weight of Old Part.
Cost of Old Part. £
Weight of New Part.
Cost of New Part. £ 5. 12. 0
Difference per Car.
Difference per Car. £ 5. 12. 0 increase.

Cost of Parts in Works which will be scrapped if commenced on:—
Series.........£.........
Series.........£.........
Series.........£.........

Signature of Mr. De LOOZE that above is correct. My/Rns. 27.6.24.

[Signatures Table]
SIGNATURES | DATE | REMARKS
MR. JOHNSON | 7 July 24 | agreed b johnson
MR. B. JOHNSON | 7.7.24 | agreed BJ
MR. ROYCE | 2.7.24 | Agreed. FHR.
MR. WORMALD | 26.6.24 | Agreed. Wor.{Arthur Wormald - General Works Manager}
MR. ROWLEDGE | 26.6.24 | Agreed. Rg.{Mr Rowledge}
MR. DAY | 28.6.24 | Agreed. Da.{Bernard Day - Chassis Design}
MR. BAILEY | 26.6.24 | Agreed. BY.{R.W. Bailey - Chief Engineer}
MR. PLATFORD | 26.6.24 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT | 2.7.24 | Agreed. E.{Mr Elliott - Chief Engineer}
MR. NORTHEY | 27.6.24 | Agreed. PN.{Mr Northey}
MR. HIVES | 4.7.24 | Agreed. E.Hives.
  
  