From RHC to EEC detailing the completion of three experiments.
| Identifier | ExFiles\Box 77\2\ scan0137 | |
| Date | 27th March 1919 | |
| To EEC. from RHC. {R. H. Coverley - Production Engineer} *X.3512 2 RHC {R. H. Coverley - Production Engineer} 3/LG27.3.19. 27th. Mar. 1919. Will you kindly note that the following experiments have been finished:- X.3012 - One set of these [handwritten: B.T.H. magneto] have been fitted to Falcon(Aero Engine) "B" engine and we have also fitted up an engine which has been despatched to Messrs. Martinsydes. X.3476 - Leather Covers have been passed and O.O. instruct-ed {J. L. Edwards} to order same. X.3512 - Copper Pipes have been fitted to Chassis 1.E.X. These are now O.K. so this can be considered completed. RHC. {R. H. Coverley - Production Engineer} [Signature] R.R. 255 B (200 T) (S.F. 103. 25-10-18) G. {Mr Griffiths - Chief Accountant / Mr Gnapp} 2244. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
