Cost estimate for extra tooling and production details for the T.2 series chassis.
| Identifier | ExFiles\Box 14\5\ Scan312 | |
| Date | 10th January 1935 | |
| STANDARDISATION OF PARTS Est. cost of extra jigs, tools and equipment (Sft {Mr Swift} /Ws.7.12.34) - £235.0.0. Could be brought on to production at 51st chassis in "T.2" series, (Sft {Mr Swift} /GH.7.12.34) without scrap. Handwritten: Lo. H.S. From GR {George Ratcliffe} /LS 10/1/35 | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
