Rolls-Royce Archives
         « Prev  Box Series  Next »        

Standardisation proposal for a two-level reserve compartment in the rear tank.


Identifier  ExFiles\Box 17\5\  Scan051
Date  2nd June 1930
  
RR 755 REVISED (10H) (DG 348 19-7-29) BM. 6/643.
COMPLETED 26.8.30. X7460
STANDARDISATION of CHASSIS PARTS.

Date: 2.6.30
X No. 7460

Description of Parts: Two-level reserve compartment in rear tank.
Origin: Sales request, to supply a greater reserve of petrol.

Experimental Test Report: This was standard on Phantom I. We propose to use the same scheme on Phantom II.
[Stamp: PHANTOM II]

Road Test Report: [blank]

Weight of Old Part: [blank]
Weight of New Part: [blank]
[Stamp: RECEIVED]
Difference per Car: [blank]

Cost of Old Part: £ 1 - 7 - 4
Cost of New Part: £ 2 - 4 - 9 U/s
Difference per Car: £ - 17/5 increase

Signature from Cost Dept. that above is correct: CPH R. {Sir Henry Royce}

Drawing No.: [blank]
Part List: [blank]

A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.........
Series.........£.........
Series.........£.........

Table of Approvals:
INITIAL | DATE | REMARKS
BJ. SG. {Arthur F. Sidgreaves - MD} | 23-5-30 | agreed SG {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} | 16.6.30 | Agreed FHR.
WOR. {Arthur Wormald - General Works Manager} | 3.6.30 | Agreed Wor. {Arthur Wormald - General Works Manager}
RG. {Mr Rowledge} | 3.6.30 | Agreed RG. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 17.6.30 | Agreed DA. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 4.6.30 | Agreed BY. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 4.6.30 | Agreed EP. {G. Eric Platford - Chief Quality Engineer} if in conjunction with non-return
E. {Mr Elliott - Chief Engineer} | 14.6.30 | Agreed AE. Valve on petrol supply feed pipe. EP. {G. Eric Platford - Chief Quality Engineer} & MX. {John H Maddocks - Chief Proving Officer}
PN. {Mr Northey} | 11.6.30 | Agreed PN. {Mr Northey} Hope to see this on production as soon as possible.
CWB. | 3.6.30 | Agreed C.
HS. {Lord Ernest Hives - Chair} | [blank] | Agreed.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙